Autonomous software modernization
Six months of migration. What if it took five days?
FlashBrain plans the entire migration. Flash Swarm executes it, with recipes, tests and validation built in.
- Human approval points
- Spending limits
- Reusable recipes
- Component-level ledger
Five days is a target for suitable, scoped workloads, not a guaranteed migration or cutover time.
The hard part isn’t rewriting code. It’s everything connected to it.
01/ The problem
Your legacy system is holding your roadmap hostage.
Thousands of procedures. Undocumented dependencies. Business rules nobody wants to break. Writing the code was never the bottleneck.
Understand the entire system. Then transform it.
02/ Plan with FlashBrain
One program. Every dependency accounted for.
FlashBrain maps your software DNA and turns the migration into projects, tasks and an execution order your team approves.
- AssessDone
- ConvertIn progress
- ValidateQueued
- Cut overNeeds approval
Months of engineering work. An agent that keeps going.
03/ Execute with Flash Swarm
Assign the program. Let Flash Swarm do the heavy lifting.
Agents implement, test, investigate failures and repair them for hours or days, within spending limits and approval points.
- Convert usp_PostInvoiceDone
- Run tests on the conversionRunning
- Fix trigger syntaxRepairing
- Cutover planAwaiting approval
Solve the pattern once. Reuse it everywhere.
04/ Engineering recipes
Thousands of changes. One proven way to make them.
Recipes hold the conversion rules, before-and-after patterns, exceptions and checks, so agents never rediscover a solved problem.
T-SQLSELECT TOP 10 * FROM Orders
PostgreSQLSELECT * FROM orders LIMIT 10
Rewritten isn’t the same as working. Prove the difference.
05/ Validate
Modernize the technology. Preserve what matters.
Every procedure, function and object sits on a migration ledger, with test results and source and target behavior compared before you sign off.
- usp_PostInvoiceCompare passed
- fn_TaxRateCompare passed
- trg_AuditOrderNeeds review
Months of manual engineering. Days of autonomous execution.
06/ The outcome
From legacy to current, with humans in control.
Your engineers make the critical decisions and the final call. FlashTeams does the rest.
- FlashBrain plans
- Flash Swarm executes
- Recipes repeat
- The ledger verifies
A program, not a project
Stop modernizing one file at a time.
The manual way
- One file at a time
- Knowledge locked in a few senior engineers
- Every change starts with rediscovery
- Risk piles up for one big cutover
With FlashTeams
- One program across the whole system
- The software DNA maps what nobody wrote down
- Agents keep going for days, within your limits
- Every object tracked and verified on a ledger
Where programs start
Different systems. One execution platform.
- 01/
SQL Server → PostgreSQL
Database modernization
Procedures, functions, triggers and data access, not just SQL syntax.
- 02/
Monolith → services
Architecture transformation
Find the service boundaries and extract functionality step by step.
- 03/
RPG · COBOL · OpenROAD
Legacy applications
Make legacy logic understandable and plan the move to a modern stack.
- 04/
Java · Spring · runtimes
Framework and platform upgrades
Find breaking changes, apply recipes and prepare the code for validation.
Your legacy software shouldn’t determine your future.
Understand the system. Build the plan. Assign the execution.